Week 6 is a Craziest week, Weird week and Hilarious week. WHY?
Because something happen in our office. Something that three of us dont expected it to happen. HAHA..
I laughed so hard when that things happen till i cry because of it. It was stupid. But i cant stand it. Haihhh. chuck chuck... can u be more hilarious? HAHAHAHA. RAMA-RAMA..?
Thursday, May 13, 2010
Tuesday, May 11, 2010
week 5
Five week! seems for us like 5 month all of us has been work here. PRESSURE.... WORK... WORKK.. AND WORRKK..!!
This week wont be any different like the previous week as the work getting more harder. We have to do things that we are not familiar with. Such as, being a technician and do a technical stuff.
But the more things we have to do. the more things we will learn.
As for this week task;
This week wont be any different like the previous week as the work getting more harder. We have to do things that we are not familiar with. Such as, being a technician and do a technical stuff.
But the more things we have to do. the more things we will learn.
As for this week task;
- we have to design a certificate for ILSAS.
- present the "Nuclear" design
- design a banner for Ministry Of Finance
- Set up the PA system for Ministry of Finance dinner
- Learn technical stuff
week 4
Week 4 is all about designing a poster for "Kolokium Tenaga Nuklear TNB"..
The first day of the week our head of unit had a meeting with the three of us. Where we were been briefing about the nuclear power that TNB trying to developed. Because of that the three of us need to design a poster using a theme "nuclear - green, clean and safe"
We also have been assign to do a flayer for microsoft office 2007 beginners. The target for this flayers is to give to all the staff that are interested to join the 3 day courses.
The first day of the week our head of unit had a meeting with the three of us. Where we were been briefing about the nuclear power that TNB trying to developed. Because of that the three of us need to design a poster using a theme "nuclear - green, clean and safe"
We also have been assign to do a flayer for microsoft office 2007 beginners. The target for this flayers is to give to all the staff that are interested to join the 3 day courses.
week 3
As usual every week our supervisor gives us new task. LOT OF WORK TO BE DONE IN A SHORT TIME. Haaaiiihh~
For this week our company will organize a "Anugerah Perkhidmatan Cemerlang (APC)" for their employee.. So basically, this week our work is more towards preparing for the event. Where we have to do 4 task;
1. Designing a poster/banner for APC
- we have to design a banner for the event using our creativity. Designing the banner is not that tough because the three of us are familiar with designing a poster back in Uniten. So when designing for our company we just use adobe photoshop and start doing it.
For this week our company will organize a "Anugerah Perkhidmatan Cemerlang (APC)" for their employee.. So basically, this week our work is more towards preparing for the event. Where we have to do 4 task;
- Designing a poster/banner for APC
- Designing the certificate for APC
- Do a montage for the opening of APC event
- Re-touch up the slide prsentation for APC
1. Designing a poster/banner for APC
- we have to design a banner for the event using our creativity. Designing the banner is not that tough because the three of us are familiar with designing a poster back in Uniten. So when designing for our company we just use adobe photoshop and start doing it.
2. Designing the certificate for APC
- for the cerfiticate our supervisor told us to use the background same with the background we use for the banner.
3.Do a montage for the opening of APC event
- for this task. is a bit tough because we have to use unfimiliar software which is Ulead Video Studio 11.
4.Re-touch up the slide prsentation for APC
- we have edit the slide by put the background for the banner in the slide
- for the cerfiticate our supervisor told us to use the background same with the background we use for the banner.
3.Do a montage for the opening of APC event
- for this task. is a bit tough because we have to use unfimiliar software which is Ulead Video Studio 11.
4.Re-touch up the slide prsentation for APC
- we have edit the slide by put the background for the banner in the slide
week 2
2nd week as a worker still give us an awkward feeling. Maybe because this is the first time the three of us enter the working environment. But the three of us have to throw the that feeling as more work for us;
- to be friend with them in spite of different background
- design a brochure for "GE Power System and Energy Courses"
- Become a facilitator for PPK orientation.
- to be friend with them in spite of different background
Subscribe to:
Comments (Atom)
.jpg)



